Eugene Onegin

Lyric Opera of Kansas City Contacts:
Tracy Davis
Director of Production
816-471-4933, x141, tmdavis@kcopera.org
Keith Brumley
Director of Design & Technical Production
816-471-4933, x146, kbrumley@kcopera.org
Production Information:
| Stage Director: |
Linda Brovsky |
| Set Designer: |
Wes McBride |
| Lighting Designer: |
Thomas Hase |
| Built by: |
Lyric Opera Scene Shop |
| Year Built: |
1999 |
Rental Costs:
Available upon request.
Extended Rental Surcharge:
The rental fee is based on a maximum of 5 performances. A fee of $1,500.00 will be charged for each additional performance. Shows on a revolving repertory system will be at a cost of $1,000.00 per performance, in addition to the rental fee.
Technical Information:
| Lyric Stage width: |
75' |
| Preferred Stage width: |
Show Deck |
| Lyric Stage depth: |
35' + 5' of apron |
| Preferred Stage depth: |
Show Deck |
| Show Deck/Flooring: |
Show Deck with a 5 degree rake: 31' deep x 56' wide |
| Additional Space requirements: |
910 square feet of offstage scenery parking |
| Line sets for scenery: |
18 |
| Line sets for electrics: |
8 |
| Tallest Deck Piece: |
15' (Porch Unit) |
| Tallest Flying Piece (soft): |
28' (Austrian Drape) |
| Tallest Flying Piece (hard): |
28' (Birch Tree) |
| Heaviest Flying Piece (hard): |
500 lbs (Plexiglass Walls) |
Props/Scenic Elements Included:
See Props Source List.
Items Not Included:
Guilt ballroom chairs were rental items.
Crew Requirements:
The following crew sizes and hours were used for scenery load-in - the number may vary for the renting company depending on its own theatre and production schedule. The Lyric Opera of Kansas City pre-hangs electrics before scenery load-in.
|
LOAD-IN |
RUN |
STRIKE |
| Carpenters: |
4 |
9 |
4 |
| # of Hours: |
8 |
|
5 |
| Props: |
2 |
2 |
2 |
| # of Hours: |
8 |
|
5 |
| Fly Rail: |
2 |
2 |
2 |
| # of Hours: |
8 |
|
5 |
| Electrics: |
2 |
2 |
2 |
| # of Hours: |
8 |
|
5 |
NOTE: The renting company is required to provide round trip airfare and hotel accommodations for the technical supervisor. This show requires technical supervisor assistance as follows: 1 day for load-in (8 hours) and 1 day for load out (5 hours).
Scenery Notes:
Change from Act I Sc1 – Sc 2, Act 1 Sc2 – Sc3 is difficult - thus the numbers on running the show.
Change from Act II Sc1 – Sc 2 is difficult: lots of props.
Transportation:
This set requires 1 (one), 53 foot air ride truck, equipped with E-track or logistic posts; load bars or straps; and packing blankets. The renting company assumes all responsibility for transportation. Transportation may be arranged through the Lyric Opera of Kansas City.
Insurance:
The renting company must supply the Lyric Opera of Kansas City with a certificate of insurance for $175,000 (one hundred and seventy-five thousand dollars).
|